Test operation of a system for monitoring direct and indirect effects on the quality and quantity of groundwater in the Holešov SPZ
-
Category:Zpolop
-
Year:2021
-
Project:Staff involved
Zelinka I., Pechanec V., Ambrožová V., Tomšů J. (2021): test operation of a system for monitoring direct and indirect effects on the quality and quantity of groundwater in the Holešov SPZ
During the trial operation 5 AMJ stations were installed, one of them monitored the hydrogeological borehole IS-4, the other 4 monitored precipitation, air temperature and humidity and soil temperature, humidity and conductivity. Standard MR2 and MR3 type rain gauges were used as rain gauges, and JUMO probes were selected and installed to measure the physico-chemical parameters of the water in the borehole (temperature, pH, redox, conductivity, water level), and the company was able to supply waterproof immersion fittings for these probes. A total of 8 probes were installed in the borehole, four each at two height levels.